Kitchen and Bathroom Refurb, Horley

This kitchen refurb had the existing ground floor bathroom removed to create a new dining area for the small kitchen.

 

A small leaded dormer was built into the rear addition of the building to allow full height french doors to be fitted out onto the patio, the original quarry tiles in the kitchen were matched and continued through to the back doors.

 

The original hot water cylinder was moved into the bedroom on the first floor and a small bathroom was fitted in a new partition of the existing bedroom.

Remodeling and Home Design
Print Print | Sitemap
© Surrey Hills Construction